FEO Home
Step 10: Construction

From the inside to the outside. An essential part of our product development is the construction. The construction of the product – or, to put it in a better way: of the casing – is subject to economic, technical, ergonomic and design-visual requirements resulting from the system specifications and those of the product design.
[ More details ]
Step 10: Construction Details

The construction of casings for our product development depends largely on the materials to be used and the production processes. As a rule, we plan with and use plastic or metal processed in the injection moulding process, machining or continuous casting process. Our construction team uses Solidworks software.
[ Done ]
Feo Elektronik GmbH ENG
Zwergerstraße 15
88214 Ravensburg, Germany
Tel. 49(0)751 295 105-20
Fax 49(0)751 295 105-90

Management: Dipl. Ing. David Clus

Registration office: county court of Ulm,
CR 551644
VAT ID NO.: DE 174353404
Person responsible for the content:
David Clus
Design, technical implementation: sons.

In spite of careful content control we accept no liability for the content of external links.

Unauthorised use of pictures, texts or documents from this website is not permitted, FEO owns the copyright.

general terms and conditions (PDF 135 KB)


DEENG ImprintData protection© 2015 Feo · All rights reserved · Certified according to ISO 9001:2008 and DIN EN ISO 13485:2012
feo elektronik facebook